| Sr | Fieldname | Type | Label | Options |
|---|---|---|---|---|
| 1 | capacity_planning |
Section Break | Capacity Planning | |
| 2 | disable_capacity_planning |
Check |
Disable Capacity Planning and Time Tracking
Disables creation of time logs against Production Orders. Operations shall not be tracked against Production Order |
|
| 3 | allow_overtime |
Check |
Allow Overtime
Plan time logs outside Workstation Working Hours. |
|
| 4 | allow_production_on_holidays |
Check | Allow Production on Holidays | |
| 5 | column_break_3 |
Column Break | ||
| 6 | capacity_planning_for_days |
Int |
Capacity Planning For (Days)
Try planning operations for X days in advance. |
|
| 7 | mins_between_operations |
Int |
Time Between Operations (in mins)
Default 10 mins |
|
| 8 | section_break_6 |
Section Break | ||
| 9 | over_production_allowance_percentage |
Percent | Over Production Allowance Percentage | |
| 10 | backflush_raw_materials_based_on |
Select | Backflush Raw Materials Based On |
BOM Material Transferred for Manufacture |
| 11 | column_break_11 |
Column Break | ||
| 12 | default_wip_warehouse |
Link | Default Work In Progress Warehouse | Warehouse |
| 13 | default_fg_warehouse |
Link | Default Finished Goods Warehouse | Warehouse |
Inherits from frappe.model.document.Document
erpnext.manufacturing.doctype.manufacturing_settings.manufacturing_settings.get_mins_between_operations ()